Answered: A belt conveyor is required to deliver… | bartleby
A belt conveyor is required to deliver crushed limestone having a bulk density of 50 lb/ft3 at the rate of 100 tons/hr. The conveyor is to be 100 ft. between pulleys with a rise of 25 ft. with a belt speed of 100 ft/min. Determine the ff: a. The minimum width of belt b. The horsepower required to drive the motor if its efficiency is 90%
